Construction of 4 irrigation pumping stations, a drainage pumping station, 80 km of GRP and PE pipes, 577 km underground drainage, 82 km of open drainage and leveling more than 2,500 hectares of valleyser land and slopes.110 km of irrigation canals and 1100 km of underground drainage and 99 km of open drainage and leveling more than 5562 ha of the right bank of the plain of Ramshir plain

 

The construction of the Bawan axis - Mashhaykh with a length of 7 km including a tunnel opening of 200 meters in length
Road construction and asphalt operation 37 km from the main herd - Daralmizan
Road construction and asphalt operations are 12 kilometers from the main road - Firoozabad (Phase 2)
Road construction and asphalt operation 73 km from the axis of the Bezia region
Road and Asphalt Operations 40 Km Main Mehr - Flock - Chab Kabakan - Alam Rudasht
Road and pavement operations 160 km from the Eghlid area
Road and asphalt road operations 259 km from the Sepidan area
Road and asphalt operation 81 km from the axis of Tabnak gas field
Road construction and asphalt operations are 21 kilometers from the main road - Firoozabad (Phase 1)
Road construction and rehabilitation of 41 km of access roads to the Lutheran exploration well

 

 

Production of half-oval canal, Shaft Construction, New Jersey and all kinds of prefabricated concrete components in the Hanijan concrete prefabricated factory
Production of half-oval canal and plumbing structures at Ramshir Canal Factory

 

 

The construction of 19 Seler and 84 km of communication roads to gas wells and 288 km of transmission lines of Tabnak gas field
The construction of 5 Seler and 10 km of communication roads to gas wells and 50 km of Homa gas pipelines
Construction of a Seler machine and 12 km of road connecting to a gas well and 18 km of gas pipelines in Pazen gas field
Construction of a Seler and 12 km of road connecting to gas well and 28 km of Asalouyeh gas field transmission lines
Construction of a 80-km pipelines 56-inch pipelines from the fourth general pipelines (Phase 6)
Implementation of the 2.5 km gas supply project to phase 1 of Mamasani Petrochemical Complex

 

Implementation of construction projects related to water, soil and agriculture activities in Khuzestan province.
Investing in the processing of crops, the production and sale of tomato paste and brine cucumber to 500 tons.
The Jar Glass Supply Project required by the province's food industry is 3.6 million.

 

Participation in shrimp breeding in Chabahar port.
Duplicate shrimp in Bushehr port.